The Major Project Podcast · Episode 006

Your PDU learning record

Advanced Work Packaging: The Billion-Dollar Productivity Lever

With Geoff Ryan

Use the episode details below to report your learning. Check your dates, add notes, adjust the amounts for what you completed, then save a copy for your records.

Ready to copy

Episode details

Activity type
Education · Online or Digital Media
Provider
The Major Project Podcast
Title
Episode 006: Advanced Work Packaging: The Billion-Dollar Productivity Lever with Geoff Ryan
Description
Give field crews executable work, align engineering and procurement with construction, and adapt the delivery plan when equipment availability drives the project.
Recording length
1 hr 14 min 44 sec

What you can learn

  • Describe the scope, materials, permits, quality and safety information needed for an executable installation work package.
  • Align engineering and procurement with a practical path of construction.
  • Plan data-centre delivery around available equipment, specialist skills, quality checks and measurable progress.
Make it yours

Your learning

Your entries stay in this browser tab. Save a copy before you leave.

PDUs to report

Amounts combine the reviewed listening time and any additional learning you record here. Reduce them for learning you did not complete. Use increments of 0.25.

Suggested: 0.75 PDUs
Suggested: 0.00 PDUs
Suggested: 0.25 PDUs

Total PDUs1.00

Add your own notes, including any sections you did not complete.

Self-reported learning record. Report only learning you completed that is relevant to your certification. This sheet does not submit a claim to PMI or certify attendance.

Learning covered in this episode

Explore key moments from the learning conversation. Each time link opens the video at that point.

Episode learning by skill area
In the videoSkill areaLearning covered
4:05 to 15:45Ways of WorkingHow workface planning expands into AWP; building executable installation packages, aligning engineering and procurement, training foremen and checking the process against readiness conditions.
22:10 to 25:35Ways of WorkingAdapting engineering and construction to equipment that can be procured, including modularity and changing technology in data centres.
27:00 to 32:00Ways of WorkingMaking construction data useful by combining delivery knowledge with data expertise and starting with the operational questions that need answers.
32:40 to 37:00Ways of WorkingBringing construction in early, keeping engineering and procurement flexible, verifying manufacturing progress and planning around delivery dates.
37:00 to 39:30Power SkillsActing as a project advocate, giving difficult advice and maintaining a whole-project perspective across competing interests.
40:00 to 44:50Ways of WorkingMatching specialist skills to the work, protecting safety and quality under time pressure and planning infrastructure for future change.
46:00 to 50:30Ways of WorkingMeasuring engineering, procurement and construction progress in a way that reflects real completion and supports a predictable outcome.
57:15 to 59:55Ways of WorkingUsing common data structures, shared standards and assurance to connect project information across different systems.