Skip to content
Major Project PodcastProjects over $1B
Episode emails

New episodes, straight to your inbox

One email each time an episode goes out, with the best tips already summarized and a link to the full brief. Unsubscribe any time.

Or follow the show Apple Podcasts Spotify YouTube
The Major Project Podcast · Episode 001

Your PDU learning record

When Every Minute Counts: The World of Turnarounds

With Grant Stead

Use the episode details below to report your learning. Check your dates, add notes, adjust the amounts for what you completed, then save a copy for your records.

Ready to copy

Episode details

Activity type
Education · Online or Digital Media
Provider
The Major Project Podcast
Title
Episode 001: When Every Minute Counts: The World of Turnarounds with Grant Stead
Description
Plan the detail behind a fast turnaround, align committed crews with the work, and turn field information into decisions leaders can act on.
Recording length
1 hr 30 min 42 sec

What you can learn

  • Explain how discovery, inspection, repair and restart shape a turnaround plan.
  • Compare a time-phased work estimate with the resources contractors have actually committed.
  • Trace reported progress back to field records and present practical interventions to leadership.
Make it yours

Your learning

Your entries stay in this browser tab. Save a copy before you leave.

PDUs to report

Amounts combine the reviewed listening time and any additional learning you record here. Reduce them for learning you did not complete. Use increments of 0.25.

Suggested: 1.00 PDUs
Suggested: 0.25 PDUs
Suggested: 0.00 PDUs

Total PDUs1.25

Add your own notes, including any sections you did not complete.

Self-reported learning record. Report only learning you completed that is relevant to your certification. This sheet does not submit a claim to PMI or certify attendance.

Learning covered in this episode

Explore key moments from the learning conversation. Each time link opens the video at that point.

Episode learning by skill area
In the videoSkill areaLearning covered
2:30 to 6:00Ways of WorkingThe turnaround lifecycle: maintenance, capital tie-ins, rapid mobilization, equipment restoration and the importance of a reliable first restart.
6:00 to 7:10Business AcumenHow refinery downtime affects lost production, storage and contractual supply commitments.
7:20 to 12:00Power SkillsCreating a calm working culture through clear direction, predictable cadence and awareness of how leaders influence behavior under pressure.
12:05 to 16:40Ways of WorkingStructuring owner and contractor responsibilities, shift handovers, productivity reviews and daily discovery meetings.
16:50 to 20:15Ways of WorkingUsing inspection history, equipment-specific contingency and rapid change control to respond to discoveries during an outage.
20:30 to 23:20Ways of WorkingManaging startup prerequisites, operational changes, isolation, inspection, repair and restoration sequences.
25:45 to 32:20Ways of WorkingTesting labor ramp-up assumptions, tracking named resource commitments before mobilization and accounting for competing demands on the workforce.
33:10 to 40:10Ways of WorkingAllowing for unforeseen findings and overlaying contractor resource plans against detailed, time-phased estimates to expose shortages and excess staffing.
42:50 to 47:00Ways of WorkingMatching schedule detail to how field teams execute and record work, including weld records, quality steps and rules of credit.
47:25 to 55:30Power SkillsBuilding leadership confidence, coaching teams to bring options and explaining the decisions behind an adverse performance report.
55:30 to 61:10Ways of WorkingMaintaining report timeliness, data ownership, repeatable ingestion, review of changes and a named person who confirms submitted information.
63:10 to 68:40Ways of WorkingConnecting drawings, material takeoffs, fabrication status and revisions to the work that must be prepared and executed.
69:30 to 71:05Ways of WorkingChecking extracted drawing title blocks and material quantities against the actual sheets, and identifying duplicate sheets that conceal missing work.
72:12 to 73:29Ways of WorkingStructuring and validating drawing and material-takeoff information before handing it to contractors so work can roll up correctly.
74:11 to 75:10Ways of WorkingChecking document identity against the actual drawing title block rather than trusting file names, folders or a separate list.

The Major Project Podcast · PDU learning record
https://www.themajorprojectpodcast.com/pdus/grant-stead

Report through https://ccrs.pmi.org/ under Education → Online or Digital Media. Retain this record for at least 18 months after your certification cycle ends.